Post #690087 by jimsflies on Wed, Aug 14, 2013 5:56 AM

You are viewing a single post. Click here to view the post in context.

Some of it can be done from the inside. I also came up with this scaffold so I should be able to get up there if I need to now. Reaching the top is still not easy from this scaffold. So I will likely have to do it from the inside and put each piece down one at a time.

I ordered the ridge cap yesterday. It is being custom fabricated with the change in slope 14/12 on one end and 8/12 on the other. It will be a couple weeks before that is done now. I may have to attach that in the center from the inside as well so I am thinking I need to get all the roof pieces cut and ready for install and then screw everything down as I move across the structure.