Welcome to the Tiki Central 2.0 Beta. Read the announcement
Celebrating classic and modern Polynesian Pop

Tiki Central / Home Tiki Bars / Long Delayed Bar Build

Post #798077 by kala60 on Tue, Oct 15, 2019 4:37 PM

You are viewing a single post. Click here to view the post in context.
K

Thanks for the reply. Your build posts delayed my Build right into a rain delay. Your one resourceful, talented Dude. Really, thanks for the tips, all good stuff.

Think I figured out a way to mount 36" bamboo on my bar front. Drill 2 lateral pass through channels at the top and bottom about 3/8" into the post on the backside and wire it to the frame. I'm pretty sure I saw that on this site but can't remember where. Would have to have a sub something to block my DUROCK Cement Backer Board. Yes, it's a pita to drill/nail/screw but being an outside/poolside bar feel it's worth the hassles. Maybe paint/stain the backer Board???

Trap Cover up.

[ Edited by: kala60 2019-10-15 16:52 ]