Welcome to the Tiki Central 2.0 Beta. Read the announcement
Tiki Central logo
Celebrating classic and modern Polynesian Pop

Tiki Central / Home Tiki Bars / Long Delayed Bar Build

Post #804253 by kala60 on 06/22/2022

You are viewing a single post. Click here to view the post in context.
K
kala60 posted on 06/22/2022

Update. Lots of "Temporary" installs. Just had to get a record of where the build is Today. Top counters are covered with "Lava" Copper sheeting. Still have to Epoxy and varnish them. Trim pieces done on the outside. Frig and Ice maker fitted. not connected yet.

I plan on a Lauhala Matting for the lower countertops, coated with 1/8" Epoxy. Is 1/8" thick enough? Should I dut the holes for the sink and ice bucket before or after Epoxy.

I put the Bar tops in for a Pic. Much more to do.

Tiki1tiki2Tiki3