Tiki Central / California Events / Help King Kuku on the Lemoyne Lanai
Post #27499 by floratina on Fri, Mar 21, 2003 12:29 AM
F
floratina
Posted
posted
on
Fri, Mar 21, 2003 12:29 AM
The downstairs 2-bedroom is all prepped and the main task will be to get it painted. Looks like the upstairs 2-bedroom is spoken for, btw. Anyway, King says that, besides the painting: Pedestal sink install in bathroom Sink faucet install uh, something about a water heater Moulding replacement around some door jams Anybody know how to install tile? There is some water seal stuff he needs to put over the tile and grout, too. There ya go. P.S. No pancakes as Mother Moynahan has a previous engagement that day. |