Welcome to the Tiki Central 2.0 Beta. Read the announcement
Tiki Central logo
Celebrating classic and modern Polynesian Pop

Tiki Central / Tiki Carving / Bosko patio project- 07-07-10 update

Post #408556 by TikiTres on Thu, Sep 18, 2008 7:38 AM

You are viewing a single post. Click here to view the post in context.
T

Thanks Henrik! Welcome back from your vacation :)

Hewey, thank you! The tiles are really cool-looking, hopefully some day I can wade through the throngs of bidders on Henrik's eBay auctions and emerge victorious with a mug to keep them company :D


I am still working on the patio structure, it has been slow going because of hurricane Ike. Luckily it weathered Ike in it's half-finished state, but I had to let it dry before resuming the roofing work. At this point the A-frame (with Bosko beam) is done, all the decking is done, the sheet metal roof trim is done, roof is felted and about 15% of the shingles are down. I need to install the two skylights before continuing with the shingles. I haven't installed the Bosko columns or trim yet, I'll wait until the end to do that so they don't get damaged. Then I'll finally have some pics to post :)