Welcome to the Tiki Central 2.0 Beta. Read the announcement
Tiki Central logo
Celebrating classic and modern Polynesian Pop

Tiki Central / Home Tiki Bars / Hapa Haole Hideaway Rebuild Again! - Open

Post #419276 by Swanky on Sun, Nov 16, 2008 5:11 PM

You are viewing a single post. Click here to view the post in context.
S


Started putting the bottom shelf in. Each piece is cut to fit. Started painting the stuff under and behind the bar. Used a tip from Howland. Watched Lowes paint section for the rejects. Got a color that worked for the room in spaces not seen much and in flat for $5 a gallon. Brad has taken a couple of colors and put them together. You end up with a dark neutral color. Much nicer to paint with a $5 gallon than a $25 gallon.

Just painting what shows. More shelves to go to cover some places.

Cut the second piece for the bar top. Cut 3 inches off the back to shorten the front overhang to 10 inches and the back to 1.

Screwed this layer down to the bar frame. More in the back side than the front. As people lean on the front, the back is where the force will be. The next layer of 3/4 inch plywood will go over this and be attched by screwing up from below.

I also screwed the display shelf to the brackets and put the Guanko in it's cubby hole.

We think we picked out a cheap but decent looking bar top material. We'll see.