Tiki Central / Other Crafts / Tiki Tiger Studios: Big long Egyptian trip report!
Post #674823 by tigertail777 on Thu, Apr 18, 2013 10:01 PM
T
tigertail777
Posted
posted
on
Thu, Apr 18, 2013 10:01 PM
Thanks for asking about the status Wendy. :) I was going to update a few days ago but wanted to wait till I had more pics of what little there has been done. Okay I take that back a lot has been done, it just feels like I am spinning my wheels because it is not going fast enough to suit me and I feel like I keep getting blocked at every turn. Must keep telling myself that Rome was not built in a day. So the main progress that has been made is we have the electrical conduit laid and buried, and a lot of the electric boxes set up waiting for my Uncle to be able to take time out of his busy schedule to do all the proper hook ups and final stuff. As for the decor, I nixed the black velvet and the tiger fur under the bamboo. Felt like it was just too much and left it bare wood. The place where the burlap is frayed and meets the edges I am toying with either using more bamboo, or getting wood slats as I said before and eventually carving tapa designs into them. I found more vintage Hawaiian fabric on ebay I liked, and am also in the process of ordering some from Sophistatiki (Dawn) from her Spoonflower site. And I found a few things also on ebay that I got good deals on that I am excited to put into the Tiki Tiger studio which I will show below. First up: my brother in law, Mike helping dig the trench for laying the electrical conduit (it had to be 2 feet deep all the way). I helped dig too and had a pretty major asthma attack to the point of almost hallucinating. Had to have a lot of protein and sugar and cold water to get the attack calmed down and stop the dizziness. Our soil after the first foot or so is nearly pure clay and harder than heck to dig through. I learned that the hard way. |